NH Bath Builders recently completed a very affordable bathroom transformation, which only took 2 days. This bathroom transformation included removing the shower and floor, then installing a new Sterling shower with a new Kohler valve and Duraceramic flooring. Whenever a tub or shower is replaced the sheetrock immediately around the unit has to be replaced as well. So we installed moisture resistant sheetrock in this area and finished the sheetrock. In this particular bathroom reno the homeowner opted to paint the bathroom to save money. We have perfected our process of bathroom remodeling to the point that all this work only took 2 days, we started Friday morning and were finished early saturday afternoon.